from SCHILLING ENGINEERING the total fulfilment

CleanSteriCell

CleanSteriCell

Bio-Technology

Articleno.: 3000.4.132

Cleanroom System for Bio-Technology Lab
GMP-Cleanroom class B, C, D, E

  • modular construction system
  • extensive cleanroom windows
  • silicone-free sealing-clip-system
  • U15 ULPA high performed-filter-fan-module
  • GMP-conformant version with equipment for filter leak test
  • fully integrated, flush mounted cleanroom lighting
  • fully integrated air circulation and return air guidance
  • on site plenum upper ceiling (concrete ceiling)
  • compact cleanroom-air conditioning system
  • fully integrated lab-working bench equipments
  • fully integrated point suction systems in EX-version
  • material changing room / pass-throughs


Pharmaceutical Production

Articleno.: 3000.4.132-01

Cleanroom System for Pharmaceutical Production
GMP-Cleanroom class B, C, D, E

  • modular construction system
  • stainless steel-wall fillings
  • extensive VSG-cleanroom windows
  • silicone-free sealing-clip-system
  • U15 ULPA high performed-filter-fan-module
  • GMP- conformant version with equipment for filter leak test
  • fully integrated, flush mounted cleanroom lighting
  • fully integrated air circulation and return air guidance
  • on site plenum upper ceiling (concrete ceiling)
  • fully integrated point suction systems in EX-version
  • fully integrated media supply


Serum Production

Articleno.: 3000.4.056

Cleanroom System for Serum Production
GMP-Cleanroom class A, B, C, D

  • modular construction system
  • extensive cleanroom windows
  • silicone-free sealing-clip-system
  • U15 ULPA high performed-filter-fan-module
  • GMP- conformant version with equipment for filter leak test
  • fully integrated, flush mounted cleanroom lighting
  • fully integrated air circulation and return air guidance
  • fully integrated media supply
  • fully integrated regulation 
  • fully integrated monitoring system (flow-velocity, particle, temperature, humidity, pressure inside the room)


Cleanroom System for Blister Center

Articleno.: 3000.4.228

Cleanroom System for Blister Center
GMP-Cleanroom Class D, E

  • modular construction system
  • composite panel-wall-fillings
  • U15 ULPA high performed-filter-fan-module
  • GMP-conformant version with filter leak test equipment
  • fully integrated, flush mounted cleanroom lighting
  • fully integrated clean air guidance
  • on site plenum upper ceiling (concrete ceiling)
  • compact cleanroom-air conditioning system
  • changing rooms for personal or material
  • fully integrated regulation
  • fully integrated monitoring system (temperature, humidity, pressure inside the room)
  • fully integrated process suction systems by reblistering


Cleanroom System for Blister Center

Articleno.: 3000.4.254

Cleanroom System for Blister Center
GMP-Cleanroom Class D, E

  • modular construction system
  • U15 ULPA high performed-filter-fan-module
  • GMP-conformant version with filter leak test equipment
  • fully integrated, flush mounted cleanroom lighting
  • fully integrated process outlet air for HD Medi
  • on site plenum upper ceiling (concrete ceiling)
  • compact cleanroom-air conditioning system
  • changing rooms for personal or material
  • integration to ROWA automation
  • fully integrated regulation
  • fully integrated monitoring system (temperature, humidity, pressure inside the room)
  • fully integrated process suction systems by reblistering


Cleanroom Operation Ceiling

Articleno.: 3000.4.183

Cleanroom Operation Ceiling
for Ophthalmologic and Orthopaedic Surgery
Cleanroom class ISO 5 inside the Operation Room

  • modular construction system
  • very low installation height
  • U15 ULPA performed-filter-fan-module
  • very quiet, soft, laminar airflow
  • GMP- conformant version with equipment for filter leak test
  • fully integrated, flush mounted cleanroom lighting
  • fully integrated air conditioning technology
  • fully integrated regulation
Cart
cart items none

News

  • 04/19/2012

    OPTATEC Exhibition 2012

    Optatec LOGO

  • 02/29/2012

    Cleanroom System CleanSteriCell® 2012 - Safety in Laboratories und Pharmacies

  • 01/28/2012

    Hospital pharmacy – Cleanroom labs ensure safety

Address
SCHILLING ENGINEERING GmbH
Industriestr. 26
D-79793 Wutöschingen

Phone: +49 (0)7746 - 92 789-0
Fax: +49 (0)7746 - 92 789-80

info@SchillingEngineering.de



SCHILLING ENGINEERING Schweiz GmbH
Dorfstrasse 60
Postfach 35
CH-8219 Trasadingen

Phone.: +41 (0)52 - 212 789-0
Fax: +41 (0)52 - 212 789-2

info@SchillingEngineering.ch